How long does a typical single-storey extension take?
Straightforward single-storey rear extensions typically run 10–16 weeks. Bigger, more complex or two-storey work runs longer. Dale will give you a realistic build programme at the estimate stage.
How much does an extension cost?
Cost per square metre varies hugely with specification. We quote every extension individually with an itemised written estimate: no square-metre guesses.
Do you handle planning applications?
No: we work alongside your architect or designer, who handles planning. We're happy to be involved in early conversations so the design is buildable.
Do you deal with building control?
Building control sign-off is between you and building control. We assist with the inspection stages on site and give building control what they need at each visit.
Do I have to move out during the build?
For most rear or side extensions, no, we work around you. For structural work that opens the existing house into the extension we'll agree with you when the noisy and dusty phases happen.
How do you stand behind the workmanship?
We don't issue formal guarantee certificates. Our commitment is to finish every job to a standard we'd want in our own homes: correct materials, careful setting out, and the same three faces on your job start to finish so nothing gets missed.
Do you sub out any of the work?
Only gas and electrical work. Everything else: groundworks, brickwork, roofing, plastering: is done by the three of us in-house.
Do you cover Faringdon and Witney as well as Swindon and Highworth?
Yes: Faringdon, Witney, Burford, Cirencester, Fairford, Lechlade, Shrivenham, plus Highworth and Swindon are our regular working area.